Good evening Daniel, some informations about the pool since our last text messages and
e-mail exchanges.
The swimming pool’s construction is complete, the impoundment done.
So I bought a second hand Leister, a heat gun and I welded the PVC geomembrane it’s difficult at te
beginning but I did it myself and finally I’m really glad wih the result.
It remains for me to start the électrolyse and the ph/metre process.
Flavien